Work on Indian River Inlet Bridge Tuesday Night/Wednesday Morning

mike-bradley-promo

There will be load testing of the Charles W. Cullen/Indian River Inlet Bridge on Tuesday and Wednesday.  The work will be done between 9pm and 5am – and will require periodic closures of all lanes in both directions for short periods throughout the night.  And in between the closures – there will be one lane open in each direction.


 

jake-smith-promo