Posts Tagged ‘Estimated cost – $2-million’
Bethany Beach Looking at a Retractable Dam to Control Flooding
Officials in Bethany Beach are considering a dam at the mouth of the Loop Canal to help control flooding in the Quiet Resort. The Town has been working on a preliminary design for a dam with a steel wall that can be raised and lowered by hydraulic arms or an inflatable bladder ā this would…
Read More